Gear AI CoPilot - Development Status
Last Updated: February 22, 2026
Current Phase: Phase 1 MVP - 65% Complete
π― Current Status
Infrastructure βββββββββββββββββββββ 95% β
Frontend UI βββββββββββββββββββββ 95% β
Frontend Logic βββββββββββββββββββββ 65% β οΈ
Backend Schema βββββββββββββββββββββ 90% β
Backend Services ββββββββββββββββββββ 30% β οΈ
API Integration βββββββββββββββββββββ 15% β
Testing βββββββββββββββββββββ 0% β
---------------------------------------------------
OVERALL βββββββββββββββββββββ 65% β οΈ
β
Completed Features
Infrastructure (95%)
- β
Deployment configs (Vercel, Netlify, EAS)
- β
CI/CD pipeline (GitHub Actions)
- β
Documentation (Architecture, API, Security)
- β
Legal docs (Privacy Policy, Terms of Service)
- β
Error handling (ErrorBoundary, health checks)
- β
Environment management
- β
Type definitions (TypeScript)
Frontend (95% UI, 65% Logic)
- β
βLiquid Glassβ design system
- β
All UI components (9 components)
- β
All screens/layouts (5 main screens)
- β
Navigation (tabs, routing, deep linking)
- β
Animations and transitions
Backend (90% Schema, 30% Services)
- β
Database schema (8 tables)
- β
RLS policies
- β
VIN decoder service (NHTSA API)
- β
Health check service
- β οΈ AI service (partial implementation)
- β οΈ Diagnostic service (partial implementation)
β οΈ In Progress / Partial
Backend Services (30% Complete)
- β οΈ Authentication service (Firebase setup, needs integration)
- β οΈ Vehicle CRUD operations (schema ready, service partial)
- β οΈ Maintenance tracking (schema ready, service partial)
- β οΈ Chat/AI integration (OpenAI setup, needs completion)
- β οΈ Manual retrieval (basic RAG pipeline implemented)
API Integration (15% Complete)
- β οΈ NHTSA API (VIN decoder working)
- β OBD-II integration (not started)
- β Stripe subscriptions (not started)
- β Market data APIs (not started)
β Not Started
Testing (0%)
- β Unit tests
- β Integration tests
- β E2E tests (Detox)
- β Performance testing
Advanced Features
- β Real-time diagnostics
- β Photo upload for receipts
- β Push notifications
- β Offline mode
π Time to Completion
Simplified MVP (Essential Features Only)
- Time: 2-3 weeks
- Scope: Auth, basic CRUD, manual chat, simple diagnostics
Full Phase 1 MVP
- Time: 4-5 weeks
- Scope: All Phase 1 features + testing + OBD integration
π¦ Deployment Readiness
β
Ready Now
- Web deployment infrastructure (Vercel/Netlify)
- Static build process working
- Security headers configured
- Legal documents in place
β οΈ Needs Completion Before Production
- Firebase Authentication integration
- Supabase CRUD services
- Basic test coverage (at least 50%)
- Environment secrets configured
π Pre-Launch Checklist
For detailed feature-by-feature analysis, see the comprehensive Development Stage Assessment.